
Cleveland County Building Inspections
PERMIT FEE SCHEDULE
Effective July 1, 2008
New Construction, Residential &
Residential fees based on finished square footage times the
square foot multiplier (.87) times the regional costs multiplier (.548).
Unfinished areas and garages will be figured at 25% of the above fee.
Cost of total Construction based on ICC Building Data Chart for Commercial or the owners value, which ever is greater, multiplied by 0.002
Renovation Permits
$100 Base Fee, plus .30 sq ft
Moved House
$150.00
Mobile Homes
Single Wide
.
$150.00
Double & Triple Wide
$200.00
Accessory Structure 400 sq ft or less
$125.00
400 sq ft or greater
$200.00
Swimming Pool . $125.00
Electrical Permit $50.00
Plumbing Permit $50.00
Mechanical Permit . $50.00
Re-inspection Fee .. $100.00
Minimum Permit Fee . $100.00
Work started without permit .Double the normal fee
The Building Official will determine building permit fees not listed. All fees to be rounded down to the nearest dollar. A $10 Homeowners Recovery Fee will be applied for all Residential Construction where a General Contractor is used.